<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comentarii la: In Muntenegru se construiește o autostradă de 169 de km cu 42 de tuneluri, 92 de poduri și viaducte. Cât costă? 11, 5 milioane euro pe kilometru. La noi e cu 7 milioane în plus!</title>
	<atom:link href="http://www.danandronic.ro/in-muntenegru-se-construie%c8%99te-o-autostrada-de-164-de-km-cu-42-de-tuneluri-92-de-poduri-%c8%99i-viducte-cat-costa-11-5-milioane-euro-pe-kilometru-la-noi-e-cu-7-milioane-in-plus.html/feed" rel="self" type="application/rss+xml" />
	<link>http://www.danandronic.ro/in-muntenegru-se-construie%c8%99te-o-autostrada-de-164-de-km-cu-42-de-tuneluri-92-de-poduri-%c8%99i-viducte-cat-costa-11-5-milioane-euro-pe-kilometru-la-noi-e-cu-7-milioane-in-plus.html</link>
	<description>100% Politic, 1% Manipulare</description>
	<lastBuildDate>Fri, 10 Feb 2012 17:07:03 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.2</generator>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
		<item>
		<title>De către: delziz</title>
		<link>http://www.danandronic.ro/in-muntenegru-se-construie%c8%99te-o-autostrada-de-164-de-km-cu-42-de-tuneluri-92-de-poduri-%c8%99i-viducte-cat-costa-11-5-milioane-euro-pe-kilometru-la-noi-e-cu-7-milioane-in-plus.html#comment-9522</link>
		<dc:creator>delziz</dc:creator>
		<pubDate>Thu, 25 Mar 2010 20:14:49 +0000</pubDate>
		<guid isPermaLink="false">http://www.danandronic.ro/?p=1082#comment-9522</guid>
		<description>pretul a crescut. croatii nu au putut oferi garantii bancare si nici de stat (croatia e in preaderare si guvernul nu poate sa dea garantii unor firme private). asa ca acest contract a fost atribuit unui consortiu eleno-israelian), cu un cost mult mai mare.i</description>
		<content:encoded><![CDATA[<p>pretul a crescut. croatii nu au putut oferi garantii bancare si nici de stat (croatia e in preaderare si guvernul nu poate sa dea garantii unor firme private). asa ca acest contract a fost atribuit unui consortiu eleno-israelian), cu un cost mult mai mare.i</p>
]]></content:encoded>
	</item>
	<item>
		<title>De către: Ionut</title>
		<link>http://www.danandronic.ro/in-muntenegru-se-construie%c8%99te-o-autostrada-de-164-de-km-cu-42-de-tuneluri-92-de-poduri-%c8%99i-viducte-cat-costa-11-5-milioane-euro-pe-kilometru-la-noi-e-cu-7-milioane-in-plus.html#comment-9504</link>
		<dc:creator>Ionut</dc:creator>
		<pubDate>Tue, 23 Mar 2010 21:09:49 +0000</pubDate>
		<guid isPermaLink="false">http://www.danandronic.ro/?p=1082#comment-9504</guid>
		<description>&lt;b&gt;&lt;a href=&quot;http://www.montenegroforvisitors.com/News/tabid/61/ID/310/Bar-Boljare-highway-construction-to-start-this-week.aspx&quot; rel=&quot;nofollow&quot;&gt;Bar – Boljare highway construction to start this week&lt;/a&gt;&lt;/b&gt;

Work on the construction of Bar – Boljare highway in Montenegro will formally start this week, local media reported. The project will be launched in the village of Gornje Mrke, north of Montenegrin capital Podgorica.

The highway, which will connect the south of Montenegro (the Port of Bar) with the Serbian border, will be 188 kilometres long and have 42 tunnels and 92 bridges and viaducts.

In March, the Croatian consortium led by Konstruktor was made preferred bidder for the project which will cost EUR 2.8 billion. Construction works are expected to finish in 2019.
 1% informare</description>
		<content:encoded><![CDATA[<p><b><a href="http://www.montenegroforvisitors.com/News/tabid/61/ID/310/Bar-Boljare-highway-construction-to-start-this-week.aspx" rel="nofollow">Bar – Boljare highway construction to start this week</a></b></p>
<p>Work on the construction of Bar – Boljare highway in Montenegro will formally start this week, local media reported. The project will be launched in the village of Gornje Mrke, north of Montenegrin capital Podgorica.</p>
<p>The highway, which will connect the south of Montenegro (the Port of Bar) with the Serbian border, will be 188 kilometres long and have 42 tunnels and 92 bridges and viaducts.</p>
<p>In March, the Croatian consortium led by Konstruktor was made preferred bidder for the project which will cost EUR 2.8 billion. Construction works are expected to finish in 2019.<br />
 1% informare</p>
]]></content:encoded>
	</item>
</channel>
</rss>

